How to get an Intermediate (I) electrical contracting license in North Carolina
North Carolina licenses electricians statewide through the NC State Board of Examiners of Electrical Contractors (NCBEEC).1 For the Intermediate (I) electrical contracting license you need a passing score on the NCBEEC Intermediate qualifying examination (100 multiple-choice questions, 6 hours, open book)2 and a criminal background check3. The board lists $125 for the exam4 and $150 for the initial license5, each a separate charge. You renew every year6 and complete at least 8 hours of continuing education7.
Who issues it
NC State Board of Examiners of Electrical Contractors (NCBEEC)
Exam
NCBEEC Intermediate qualifying examination (100 multiple-choice questions, 6 hours, open book)2
On this page
- North Carolina electrician licenses
- Applies to every license level
- Who needs an Intermediate (I) electrical contracting license
- Requirements for an Intermediate (I) electrical contracting license
- How much an Intermediate (I) electrical contracting license costs
- Renewal and continuing education
- Limited (L) electrical contracting license
- Special Restricted Electric Sign (SP-ES) license
- Special Restricted Elevator (SP-EL) license
- Special Restricted Fire Alarm/Low-Voltage (SP-FA/LV) license
- Special Restricted Groundwater Pump (SP-WP) license
- Special Restricted Plumbing, Heating and Air Conditioning (SP-PH) license
- Special Restricted Single Family Detached Residential Dwelling (SP-SFD) license
- Special Restricted Swimming Pool (SP-SP) license
- Unlimited (U) electrical contracting license
- Laws and rules
- Common questions
- Electrician licenses in other states
North Carolina electrician licenses
North Carolina issues 10 electrician credentials. Each has its own section below; the table shows what each one covers and its headline requirements.
| License | What it covers | Exam | Application or license fee |
|---|---|---|---|
| Intermediate (I) electrical contracting license | A single electrical contracting project worth up to $150,000.6 | Yes3 | $1505 |
| Limited (L) electrical contracting license | – | Yes3 | $1005 |
| Special Restricted Electric Sign (SP-ES) license | Electrical wiring only as an incident to the licensee's electric sign business, directly related to electric signs and isolated from building wiring.9 | Yes3 | $1005 |
| Special Restricted Elevator (SP-EL) license | Electrical wiring only as an incident to the licensee's elevator, dumbwaiter, escalator, moving walk or personnel hoist business.10 | Yes3 | $1005 |
| Special Restricted Fire Alarm/Low-Voltage (SP-FA/LV) license | Only fire alarm, burglar alarm and low-voltage wiring and directly related wiring.11 | Yes3 | $1005 |
| Special Restricted Groundwater Pump (SP-WP) license | Electrical wiring only as an incident to the licensee's groundwater pump business, directly related to a groundwater pump.12 | Yes3 | $1005 |
| Special Restricted Plumbing, Heating and Air Conditioning (SP-PH) license | Electrical wiring only as an incident to the licensee's plumbing, heating or air-conditioning business, directly related to that equipment.13 | Yes3 | $1005 |
| Special Restricted Single Family Detached Residential Dwelling (SP-SFD) license | Electrical wiring and devices in or on a single-family residential dwelling, or ancillary to one; project value capped at the limited-license maximum.14 | Yes3 | $1005 |
| Special Restricted Swimming Pool (SP-SP) license | Swimming-pool bonding work only, as an incident to the licensee's swimming pool business.15 | Yes3 | $1005 |
| Unlimited (U) electrical contracting license | Any electrical contracting project regardless of value.6 | Yes3 | $2005 |
Applies to every license level
These rules are the same for several of the North Carolina electrician licenses on this page, so they are shown once here, with the licenses they apply to. Each license's own section lists only what differs.
1. Every license level (all 10)
Requirements
- Minimum age
- 18 years old3
- Background check
- Background check required3
The Board may discipline applicants or licensees convicted of a crime involving fraud or moral turpitude.1 - Also required
- Each license must list at least one qualified individual (who passed the exam) regularly on active duty at each place of business.1
Fees
| Fee | Amount | Paid to | Notes |
|---|---|---|---|
| Exam fee | $1254 | NCBEEC | Not refundable. Effective July 1, 2023 |
| Examination Review | $254 | NCBEEC | Optional supervised review of a failed exam (one time). Not refundable |
| Duplicate or replacement license | $156 | NCBEEC | – |
| License verification to another state | $255 | NCBEEC | – |
Each line is a separate charge as the board lists it. The board does not publish a combined total, so none is shown here.
How to apply
- Read the Exam Information Handbook and choose the classification.2 Form (PDF, ncbeec.org)2
- Send the Application for Examination (with experience documentation and two character statements) and the $125 fee to the Board.2
- After the approval letter, wait for the PSI eligibility email and book the exam within the 90-day authorization window.2
- Pass the exam (70 or higher; score given the same day).2
- Take the free 4-hour Laws and Rules Course within 12 months of qualifying (counts toward first-renewal CE).7
Renewal
- How often
- Every year6
- When it expires
- Annual; renewal application and fee due 30 days before expiry; notice sent about 60 days before. Online renewal prints its own certificate.16
- Required topics
- Board-approved courses in subjects related to electrical contracting; at least half in person; extra hours may carry forward up to two more years.7
- If it expires
- Expired license (failure to renew) can be renewed without exam within 12 months; after 12 months the qualified individual needs 500 hours of primary experience in the last 12 months, current fees, the late fee and CE; otherwise apply anew with exam.1
From another state
- Route
- Exam score transfer
- What the board says
- Since February 2023 the Board accepts NASCLA Accredited Electrical Examination results: the Electrical Contractor/Master Electrician exam qualifies for SP, Limited, Intermediate and Unlimited; the Residential Electrical Contractor exam for SP-SFD. Transcripts must be sent to NCBEEC.8
2. Every license level except Intermediate (I) electrical contracting license and Unlimited (U) electrical contracting license
Fees
| Fee | Amount | Paid to | Notes |
|---|---|---|---|
| Initial license fee | $1005 | NCBEEC | Annual; one license and fee per place of business (21 NCAC 18B.0403). Effective July 1, 2023 |
How to apply
- File the New License Application for the classification with the annual license fee, listing yourself as the qualified individual.6 ncbeec.org6
Renewal
- Renewal fee
- $1005 (Annual renewal)
3. Every license level except Intermediate (I) electrical contracting license, Limited (L) electrical contracting license, Special Restricted Single Family Detached Residential Dwelling (SP-SFD) license and Unlimited (U) electrical contracting license
Renewal
- Continuing education
- At least 4 hours each renewal period7
4. Special Restricted Electric Sign (SP-ES) license, Special Restricted Elevator (SP-EL) license, Special Restricted Groundwater Pump (SP-WP) license, Special Restricted Plumbing, Heating and Air Conditioning (SP-PH) license and Special Restricted Swimming Pool (SP-SP) license
Requirements
- Also required
- Applicant must show the firm lawfully conducts the related business (plumbing/HVAC, pump, sign, elevator or pool) in North Carolina.17
5. Intermediate (I) electrical contracting license, Limited (L) electrical contracting license, Special Restricted Single Family Detached Residential Dwelling (SP-SFD) license and Unlimited (U) electrical contracting license
Renewal
- Continuing education
- At least 8 hours each renewal period7
6. Intermediate (I) electrical contracting license and Unlimited (U) electrical contracting license
Requirements
- Also required
- A bonding ability statement (or bank line-of-credit letter) is required to activate the license.6
How to apply
- File the New License Application for the classification with the annual license fee, listing yourself as the qualified individual and a bonding ability statement.6 ncbeec.org6
Who needs an Intermediate (I) electrical contracting license
A single electrical contracting project worth up to $150,000.6
Requirements for an Intermediate (I) electrical contracting license
More rules for this license are shared with other levels: group 1, group 5 and group 6 under Applies to every license level.
- Exam
- NCBEEC Intermediate qualifying examination (100 multiple-choice questions, 6 hours, open book)2
Given by: PSI2
Passing score: 70 out of 10018
When you can take it: Board approval first (experience and character statements); the approval sets a 90-day authorization period to schedule and sit the exam with PSI.2
Study references: NC licensing law (G.S. 87 Art. 4, 21 NCAC 18B), NEC 2020, NFPA 72 (2013), NASCLA Contractors Guide (NC Electrical Edition).2
Retakes: Wait 90 days (3 months) before retaking the same classification; reapply with a new exam fee. A different classification may be tried immediately if eligible.2
How much an Intermediate (I) electrical contracting license costs
| Fee | Amount | Paid to | Notes |
|---|---|---|---|
| Initial license fee | $1505 | NCBEEC | Annual; one license and fee per place of business (21 NCAC 18B.0403). Effective July 1, 2023 |
Renewal and continuing education
- Renewal fee
- $1505 (Annual renewal)
Renewal planner
Enter the expiration date printed on your North Carolina Intermediate (I) electrical contracting license. The count is worked out on your device from today's date; nothing is sent anywhere.
Limited (L) electrical contracting license
Requirements
- Exam
- NCBEEC Limited qualifying examination (100 multiple-choice questions, 6 hours, open book)2
Given by: PSI2
Passing score: 70 out of 10018
When you can take it: Board approval first (experience and character statements); the approval sets a 90-day authorization period to schedule and sit the exam with PSI.2
Study references: NC licensing law (G.S. 87 Art. 4, 21 NCAC 18B), NEC 2020, NFPA 72 (2013), NASCLA Contractors Guide (NC Electrical Edition).2
Retakes: Wait 90 days (3 months) before retaking the same classification; reapply with a new exam fee. A different classification may be tried immediately if eligible.2
More rules for this license are shared with other levels: group 1, group 2 and group 5 under Applies to every license level.
Special Restricted Electric Sign (SP-ES) license
Electrical wiring only as an incident to the licensee's electric sign business, directly related to electric signs and isolated from building wiring.9
Requirements
- Exam
- NCBEEC SP-ES qualifying examination (40 multiple-choice questions, 3 hours, open book)2
Given by: PSI2
Passing score: 70 out of 10018
When you can take it: Board approval first (experience and character statements); the approval sets a 90-day authorization period to schedule and sit the exam with PSI.2
Study references: NC licensing law (G.S. 87 Art. 4, 21 NCAC 18B), NEC 2020, NFPA 72 (2013), NASCLA Contractors Guide (NC Electrical Edition).2
Retakes: Wait 90 days (3 months) before retaking the same classification; reapply with a new exam fee. A different classification may be tried immediately if eligible.2
More rules for this license are shared with other levels: group 1, group 2, group 3 and group 4 under Applies to every license level.
Special Restricted Elevator (SP-EL) license
Electrical wiring only as an incident to the licensee's elevator, dumbwaiter, escalator, moving walk or personnel hoist business.10
Requirements
- Exam
- NCBEEC SP-EL qualifying examination (40 multiple-choice questions, 3 hours, open book)2
Given by: PSI2
Passing score: 70 out of 10018
When you can take it: Board approval first (experience and character statements); the approval sets a 90-day authorization period to schedule and sit the exam with PSI.2
Study references: NC licensing law (G.S. 87 Art. 4, 21 NCAC 18B), NEC 2020, NFPA 72 (2013), NASCLA Contractors Guide (NC Electrical Edition).2
Retakes: Wait 90 days (3 months) before retaking the same classification; reapply with a new exam fee. A different classification may be tried immediately if eligible.2
More rules for this license are shared with other levels: group 1, group 2, group 3 and group 4 under Applies to every license level.
Special Restricted Fire Alarm/Low-Voltage (SP-FA/LV) license
Only fire alarm, burglar alarm and low-voltage wiring and directly related wiring.11
Requirements
- Exam
- NCBEEC SP-FA/LV qualifying examination (50 multiple-choice questions, 3 hours, open book)2
Given by: PSI2
Passing score: 70 out of 10018
When you can take it: Board approval first (experience and character statements); the approval sets a 90-day authorization period to schedule and sit the exam with PSI.2
Study references: NC licensing law (G.S. 87 Art. 4, 21 NCAC 18B), NEC 2020, NFPA 72 (2013), NASCLA Contractors Guide (NC Electrical Edition).2
Retakes: Wait 90 days (3 months) before retaking the same classification; reapply with a new exam fee. A different classification may be tried immediately if eligible.2
More rules for this license are shared with other levels: group 1, group 2 and group 3 under Applies to every license level.
Special Restricted Groundwater Pump (SP-WP) license
Electrical wiring only as an incident to the licensee's groundwater pump business, directly related to a groundwater pump.12
Requirements
- Exam
- NCBEEC SP-WP qualifying examination (40 multiple-choice questions, 3 hours, open book)2
Given by: PSI2
Passing score: 70 out of 10018
When you can take it: Board approval first (experience and character statements); the approval sets a 90-day authorization period to schedule and sit the exam with PSI.2
Study references: NC licensing law (G.S. 87 Art. 4, 21 NCAC 18B), NEC 2020, NFPA 72 (2013), NASCLA Contractors Guide (NC Electrical Edition).2
Retakes: Wait 90 days (3 months) before retaking the same classification; reapply with a new exam fee. A different classification may be tried immediately if eligible.2
More rules for this license are shared with other levels: group 1, group 2, group 3 and group 4 under Applies to every license level.
Special Restricted Plumbing, Heating and Air Conditioning (SP-PH) license
Electrical wiring only as an incident to the licensee's plumbing, heating or air-conditioning business, directly related to that equipment.13
Requirements
- Exam
- NCBEEC SP-PH qualifying examination (40 multiple-choice questions, 3 hours, open book)2
Given by: PSI2
Passing score: 70 out of 10018
When you can take it: Board approval first (experience and character statements); the approval sets a 90-day authorization period to schedule and sit the exam with PSI.2
Study references: NC licensing law (G.S. 87 Art. 4, 21 NCAC 18B), NEC 2020, NFPA 72 (2013), NASCLA Contractors Guide (NC Electrical Edition).2
Retakes: Wait 90 days (3 months) before retaking the same classification; reapply with a new exam fee. A different classification may be tried immediately if eligible.2
More rules for this license are shared with other levels: group 1, group 2, group 3 and group 4 under Applies to every license level.
Special Restricted Single Family Detached Residential Dwelling (SP-SFD) license
Electrical wiring and devices in or on a single-family residential dwelling, or ancillary to one; project value capped at the limited-license maximum.14
Requirements
- Exam
- NCBEEC SP-SFD qualifying examination (40 multiple-choice questions, 3 hours, open book)2
Given by: PSI2
Passing score: 70 out of 10018
When you can take it: Board approval first (experience and character statements); the approval sets a 90-day authorization period to schedule and sit the exam with PSI.2
Study references: NC licensing law (G.S. 87 Art. 4, 21 NCAC 18B), NEC 2020, NFPA 72 (2013), NASCLA Contractors Guide (NC Electrical Edition).2
Retakes: Wait 90 days (3 months) before retaking the same classification; reapply with a new exam fee. A different classification may be tried immediately if eligible.2
More rules for this license are shared with other levels: group 1, group 2 and group 5 under Applies to every license level.
Special Restricted Swimming Pool (SP-SP) license
Swimming-pool bonding work only, as an incident to the licensee's swimming pool business.15
Requirements
- Exam
- NCBEEC SP-SP qualifying examination (25 multiple-choice questions, 1 hour, open book)2
Given by: PSI2
Passing score: 70 out of 10018
When you can take it: Board approval first (experience and character statements); the approval sets a 90-day authorization period to schedule and sit the exam with PSI.2
Study references: NC licensing law (G.S. 87 Art. 4, 21 NCAC 18B), NEC 2020, NFPA 72 (2013), NASCLA Contractors Guide (NC Electrical Edition).2
Retakes: Wait 90 days (3 months) before retaking the same classification; reapply with a new exam fee. A different classification may be tried immediately if eligible.2
More rules for this license are shared with other levels: group 1, group 2, group 3 and group 4 under Applies to every license level.
Unlimited (U) electrical contracting license
Any electrical contracting project regardless of value.6
Requirements
- Exam
- NCBEEC Unlimited qualifying examination (100 multiple-choice questions, 6 hours, open book)2
Given by: PSI2
Passing score: 70 out of 10018
When you can take it: Board approval first (experience and character statements); the approval sets a 90-day authorization period to schedule and sit the exam with PSI.2
Study references: NC licensing law (G.S. 87 Art. 4, 21 NCAC 18B), NEC 2020, NFPA 72 (2013), NASCLA Contractors Guide (NC Electrical Edition).2
Retakes: Wait 90 days (3 months) before retaking the same classification; reapply with a new exam fee. A different classification may be tried immediately if eligible.2 - Also required
- Two written statements from people who know the applicant's electrical experience, attesting to ability to supervise unlimited-class work.3
Fees
| Fee | Amount | Paid to | Notes |
|---|---|---|---|
| Initial license fee | $2005 | NCBEEC | Annual; one license and fee per place of business (21 NCAC 18B.0403). Effective July 1, 2023 |
Renewal
- Renewal fee
- $2005 (Annual renewal)
More rules for this license are shared with other levels: group 1, group 5 and group 6 under Applies to every license level.
Laws and rules
The requirements above come from these laws and board rules.
Common questions
Can I transfer my electrician license to North Carolina?
NCBEEC publishes this route for the Intermediate (I) electrical contracting license: exam score transfer8. Conditions and forms.
Electrician licenses in other states
- Alabama
- Alaska
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Hawaii
- Idaho
- Indiana
- Iowa
- Kansas
- Kentucky
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Nebraska
- Nevada
- New Hampshire
- New Mexico
- North Dakota
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- South Carolina
- South Dakota
- Tennessee
- Texas
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Sources
Every number and rule above links to one of these official pages. Select a footnote number to read the board's own words.
- NCBEEC Exam Handbook (PSI), incl. G.S. Chapter 87 Article 4 and G.S. 93B-15.1NC State Board of Examiners of Electrical ContractorsChecked November 7, 2026
- ExaminationsNC State Board of Examiners of Electrical ContractorsChecked November 7, 2026
- 21 NCAC 18B.0201 REQUIREMENTS FOR ALL EXAMINATION APPLICANTSNorth Carolina Office of Administrative Hearings (NC Administrative Code)Dated March 1, 2023Checked November 7, 2026
- 21 NCAC 18B.0209 FEESNorth Carolina Office of Administrative Hearings (NC Administrative Code)Dated July 1, 2023Checked November 7, 2026
- Fees & ServicesNC State Board of Examiners of Electrical ContractorsChecked November 7, 2026
- LicensingNC State Board of Examiners of Electrical ContractorsChecked November 7, 2026
- 21 NCAC 18B.1101 CONTINUING EDUCATION REQUIREMENTS: LISTED QUALIFIEDNorth Carolina Office of Administrative Hearings (NC Administrative Code)Dated January 1, 2025Checked November 7, 2026
- NASCLANC State Board of Examiners of Electrical ContractorsChecked November 7, 2026
- 21 NCAC 18B.0809 SCOPE OF SP-ES LICENSENorth Carolina Office of Administrative Hearings (NC Administrative Code)Checked November 7, 2026
- 21 NCAC 18B.0806 SCOPE OF SP-EL LICENSENorth Carolina Office of Administrative Hearings (NC Administrative Code)Checked November 7, 2026
- 21 NCAC 18B.0804 SCOPE OF SP-FA/LV LICENSENorth Carolina Office of Administrative Hearings (NC Administrative Code)Checked November 7, 2026
- 21 NCAC 18B.0808 SCOPE OF SP-WP LICENSENorth Carolina Office of Administrative Hearings (NC Administrative Code)Checked November 7, 2026
- 21 NCAC 18B.0807 SCOPE OF SP-PH LICENSENorth Carolina Office of Administrative Hearings (NC Administrative Code)Checked November 7, 2026
- 21 NCAC 18B.0803 SCOPE OF SP-SFD LICENSENorth Carolina Office of Administrative Hearings (NC Administrative Code)Checked November 7, 2026
- 21 NCAC 18B.0810 SCOPE OF SP-SP LICENSENorth Carolina Office of Administrative Hearings (NC Administrative Code)Checked November 7, 2026
- 21 NCAC 18B.0405 LICENSE RENEWAL DUE DATENorth Carolina Office of Administrative Hearings (NC Administrative Code)Checked November 7, 2026
- 21 NCAC 18B.0401 LICENSE APPLICANTS: REQUIREMENTS FOR EACH CLASSIFICATIONNorth Carolina Office of Administrative Hearings (NC Administrative Code)Checked November 7, 2026
- 21 NCAC 18B.0204 EXAMINATIONSNorth Carolina Office of Administrative Hearings (NC Administrative Code)Checked November 7, 2026